Back to projects

FUEL SEPARATOR SYSTEM - SEC Arar Power Plant

Client: Saudi Electricity Comp. – Arar Power Plant
Status: Completed



Installation of New Fuel treatment system.

 

1.    Dismantling of old Treatment system

2.    Dismantling of old pumping skid

3.    Dismantling of old boiler unit

4.    Dismantling of old control cabinets

 

5.    Installation of new distillate treatment system

6.    Associate Mechanical modification works.

7.    Electrical & Instrumentation works.

8.    Fabrication and installation of piping.

 

9.    Supply and installation of 10-ton overhead chain pulley block with rails.

10.Fire fighting safety system with sprinklers supply and installation of fire fighting safety system, smoke detectors and fire alarm.

11.Common drain line with flexible hoses to be fabricated and connected for the new separator skid for all the drain points.

12.Testing and commissioning of the new Fuel treatment System.

GALLERY

3 Photos

.

.

.