HAZARDOUS WASTE INCINERATOR PLANT PROJECT

Client: BeeA’h
Status: Completed


Supply of Materials, Fabrication and Erection of Structural Steel including, 
 

1.    Pipe Racks

2.    Super Equipment Structures

3.    Platforms

4.    Steel Building and Shelters

5.    Codes and Standards used: ASME SEC IX, AWS D1.1

Supply of Materials, Fabrication, Installation and Testing of Various Piping 
 
  1. CS pipes of sizes from 1/2" to 12"
  2. SS pipes of sizes from 1/2" to 10"
  3. Codes and Standards used: ASME B31.3, ANSI B16.25 ASME SEC IX and SEC V
Supply of Materials, Fabrication, Installation of Various Process Equipment and Storage Tanks/Vessels.

1.    Rotary Kiln

2.    Secondary Combustion Chamber (20M (H) x 8M (Dia))

3.    Hot Ducts & Emergency Vent Cap Assembly

4.    Evaporative Cooler (20M (H) x 8M (Dia))

5.    Baghouse – 10 chambers

6.    Portable Water Storage Tanks ( 200M3)

7.    Waste Storage Tanks 10M3 each 6 nos.

 

Supply of Materials, Insulation and Cladding of pipelines and Equipments.

1.    Water Pipe Lines

2.    Baghouse and Evaporative cooler.

  

Plant Per-Commissioning, Commissioning & Start-Up support.

1.    Cold Loop and Hot Loop Checks of individual IO’s

2.    Instruments On-Site Calibration and Configuration based on Process parameters (Endress+Hauser & Siemens)

3.    Checking and Verifying Individual system interlocks and Safety features GE RX3i PAC system.

4.    Configuring, Commissioning MCC panel Schneider ATV 600 VFD and Altistart Soft starters.

5.    Control Panel & Junction Box Installation, termination and ferruling. 