1. Dismantling of old Treatment system
2. Dismantling of old pumping skid
3. Dismantling of old boiler unit
4. Dismantling of old control cabinets
5. Installation of new distillate treatment system
6. Associate Mechanical modification works.
7. Electrical & Instrumentation works.
8. Fabrication and installation of piping.
9. Supply and installation of 10-ton overhead chain pulley block with rails.
10.Fire fighting safety system with sprinklers supply and installation of fire fighting safety system, smoke detectors and fire alarm.
11.Common drain line with flexible hoses to be fabricated and connected for the new separator skid for all the drain points.
12.Testing and commissioning of the new Fuel treatment System.
1. Pipe Racks
2. Super Equipment Structures
3. Platforms
4. Steel Building and Shelters
5. Codes and Standards used: ASME SEC IX, AWS D1.1
1. Rotary Kiln
2. Secondary Combustion Chamber (20M (H) x 8M (Dia))
3. Hot Ducts & Emergency Vent Cap Assembly
4. Evaporative Cooler (20M (H) x 8M (Dia))
5. Baghouse – 10 chambers
6. Portable Water Storage Tanks ( 200M3)
7. Waste Storage Tanks 10M3 each 6 nos.
1. Water Pipe Lines
2. Baghouse and Evaporative cooler.
1. Cold Loop and Hot Loop Checks of individual IO’s
2. Instruments On-Site Calibration and Configuration based on Process parameters (Endress+Hauser & Siemens)
3. Checking and Verifying Individual system interlocks and Safety features GE RX3i PAC system.
4. Configuring, Commissioning MCC panel Schneider ATV 600 VFD and Altistart Soft starters.
5. Control Panel & Junction Box Installation, termination and ferruling.
1. Fabrication & installation of preheater tanks.
2. Fabrication & installation of Stainless Steel Scrubber tanks.
3. Fabrication & installation of Cooling System & Storage tank
4. Fabrication of shredder machine foundation and erection.
5. Construction of dyke wall.
6. Fabrication and installation of hood for the machine.
7. Firewater piping.
8. Fabrication and installation of boiler chiming
· 2013 – 9 Metallic Bellow Convolution Replacement
1. Replacement of Convolution of Sizes -42” , 78” and 84”
2. Provide Support to OEM for remaining Bellow inspection
3. Carry out 2ply test and produce results for OEM verification.
· 2015 – 13 Metallic Bellow Convolution Replacement
1. Replacement of Convolution of Sizes -42” , 66”, 78”and 84”
2. Provide Support to OEM for remaining Bellow inspection
3. Carry out 2ply test and produce results for OEM verification.
· 2017 – 1 Metallic bellow liner Replacement ( Emergency Shutdow)
1. Replacement of internal liner of 78” line.
2. Carry out 2ply test and produce results for OEM verification.