Client: 
Status: Completed

View Gallery

ACCIONA

Client: SWCC
Status: On Going
Supply of Materials, Fabrication and Erection of Steel Structure including Handrails and Ladders
View Gallery

FUEL SEPARATOR SYSTEM - SEC Arar Power Plant

Client: Saudi Electricity Comp. – Arar Power Plant
Status: Completed



Installation of New Fuel treatment system.

 

1.    Dismantling of old Treatment system

2.    Dismantling of old pumping skid

3.    Dismantling of old boiler unit

4.    Dismantling of old control cabinets

 

5.    Installation of new distillate treatment system

6.    Associate Mechanical modification works.

7.    Electrical & Instrumentation works.

8.    Fabrication and installation of piping.

 

9.    Supply and installation of 10-ton overhead chain pulley block with rails.

10.Fire fighting safety system with sprinklers supply and installation of fire fighting safety system, smoke detectors and fire alarm.

11.Common drain line with flexible hoses to be fabricated and connected for the new separator skid for all the drain points.

12.Testing and commissioning of the new Fuel treatment System.


View Gallery

HAZARDOUS WASTE INCINERATOR PLANT PROJECT

Client: BeeA’h
Status: Completed


Supply of Materials, Fabrication and Erection of Structural Steel including, 
 

1.    Pipe Racks

2.    Super Equipment Structures

3.    Platforms

4.    Steel Building and Shelters

5.    Codes and Standards used: ASME SEC IX, AWS D1.1

Supply of Materials, Fabrication, Installation and Testing of Various Piping 
 
  1. CS pipes of sizes from 1/2" to 12"
  2. SS pipes of sizes from 1/2" to 10"
  3. Codes and Standards used: ASME B31.3, ANSI B16.25 ASME SEC IX and SEC V
Supply of Materials, Fabrication, Installation of Various Process Equipment and Storage Tanks/Vessels.

1.    Rotary Kiln

2.    Secondary Combustion Chamber (20M (H) x 8M (Dia))

3.    Hot Ducts & Emergency Vent Cap Assembly

4.    Evaporative Cooler (20M (H) x 8M (Dia))

5.    Baghouse – 10 chambers

6.    Portable Water Storage Tanks ( 200M3)

7.    Waste Storage Tanks 10M3 each 6 nos.

 

Supply of Materials, Insulation and Cladding of pipelines and Equipments.

1.    Water Pipe Lines

2.    Baghouse and Evaporative cooler.

  

Plant Per-Commissioning, Commissioning & Start-Up support.

1.    Cold Loop and Hot Loop Checks of individual IO’s

2.    Instruments On-Site Calibration and Configuration based on Process parameters (Endress+Hauser & Siemens)

3.    Checking and Verifying Individual system interlocks and Safety features GE RX3i PAC system.

4.    Configuring, Commissioning MCC panel Schneider ATV 600 VFD and Altistart Soft starters.

5.    Control Panel & Junction Box Installation, termination and ferruling. 


View Gallery

PRE-HEATER BITUMEN TANK FABRICATION & INSTALLATION

Client: Dermabit Waterproofing Industry (DWI)
Status: Completed






Tank Fabrication and Installation.

           

1.    Fabrication & installation of preheater tanks.

2.    Fabrication & installation of Stainless Steel Scrubber tanks.

3.    Fabrication & installation of Cooling System & Storage tank

4.    Fabrication of shredder machine foundation and erection.

5.    Construction of dyke wall.

6.    Fabrication and installation of hood for the machine.

7.    Firewater piping.

8.    Fabrication and installation of boiler chiming


View Gallery

REFURBISHMENT OF HYDROGEN GENERATOR

Client: MARAFIQ - Yanbu
Status: Completed

View Gallery

TURNAROUND: REPLACEMENT OF EXPANSION JOINT

Client: IBN SINA
Status: Completed



IBN SINA Turnarounds – For Expansion Joints Replacement, Inspection and Testing
 

·       2013 – 9 Metallic Bellow Convolution Replacement

1.    Replacement of Convolution of Sizes -42” , 78” and 84”

2.    Provide Support to OEM for remaining Bellow inspection

3.    Carry out 2ply test and produce results for OEM verification.

 

·       2015 – 13 Metallic Bellow Convolution Replacement

1.    Replacement of Convolution of Sizes -42” , 66”, 78”and  84”

2.    Provide Support to OEM for remaining Bellow inspection

3.    Carry out 2ply test and produce results for OEM verification.

 

·       2017 – 1 Metallic bellow liner Replacement ( Emergency Shutdow)

1.    Replacement of internal liner of 78” line.

2.    Carry out 2ply test and produce results for OEM verification.

 


View Gallery